Standard Cited: 19100119 D03 II Process safety management of highly hazardous chemicals.
Inspection Nr: 1188179.015
Citation: 01001A
Citation Type: Serious
Abatement Date: 03/20/2017 2
Initial Penalty: $6,926.00
Current Penalty: $6,250.00
Issuance Date: 03/03/2017
Nr Instances: 3
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0317900
Contest Date: 03/30/2017
Final Order: 07/13/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/13/2017 | $6,250.00 | 03/20/2017 | Serious | |
Penalty | C: Contested | 03/30/2017 | $6,926.00 | 03/20/2017 | Serious | |
Penalty | Z: Issued | 03/03/2017 | $6,926.00 | 03/20/2017 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.119(d)(3)(ii): The employer did not document that equipment complies with recognized and generally accepted good engineering practices. a) Orefield Cold Storage & Distribution Center, Inc. - On or about November 1, 2016, the employer did not document that the door entrance from the maintenance room into the compressor / engine room complies with their chosen recognized and generally accepted good engineering practices of IIAR 2, in that the door does not open outward and is not tight fitting and does not meet requirements of IIAR 2- 1999 section 6.3.1.5. b) Orefield Cold Storage & Distribution Center, Inc. - On or about November 1, 2016, the employer did not document that the emergency shower and eye wash locations complies with their chosen recognized and generally accepted good engineering practices of IIAR 2, in that an eye-wash and body shower unit is not located just outside the machinery room exit door which does not meet requirements of IIAR 2- 1999 section 6.3.1.4. c) Orefield Cold Storage & Distribution Center, Inc. - On or about November 1, 2016, the employer did not document that a floor drain below the suction accumulator vessel #5 complies with their chosen recognized and generally accepted good engineering practices of IIAR 2, in that a means was not provided to prevent contamination of the drainage system by oil or ammonia which does not meet requirements of IIAR 2- 1999 section 6.3.1.9.