Standard Cited: 19100268 B07 Telecommunications.

Inspection Nr: 1187002.015

Citation: 01001A

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $12,675.00

Current Penalty: $8,238.00

Issuance Date: 03/31/2017

Nr Instances: 1

Nr Exposed: 1

Abatement Date: 04/26/2017

Gravity: 10

Report ID: 0626300

Contest Date:

Final Order: 04/18/2017

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 04/18/2017 $8,238.00 04/26/2017 Serious  
Penalty Z: Issued 03/31/2017 $12,675.00 04/26/2017 Serious  

Text For Citation: 01 Item/Group: 001A Hazard:

29 CFR 1910.268(b)(7): The employer did not ensure that no employee approached or took any conductive object closer to any electrically energized overhead power lines and parts than prescribed in Table R-2 or in (i) - (iii) of this section: (a) On or about October 25, 2016, on the east side of FM 1461, the employer did not ensure an employee installing telecommunications strand maintained a minimum approach distance to an energized overhead power line with a phase-to-phase voltage of approximately 24.9 kV.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.