Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1158143.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,471.00
Current Penalty: $12,471.00
Issuance Date: 12/15/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/30/2016
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 12/29/2016
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/29/2016 | $12,471.00 | 12/30/2016 | Serious | |
Penalty | Z: Issued | 12/15/2016 | $12,471.00 | 12/30/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(4)(ii): The energy control procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy. On or about June 23, 2016 on the north side of the shop, the service procedures for equipment such as, but not limited to, the MacTurn 550W CNC Lathe failed to clearly identify all of the specific steps to be followed by employees to de-energize the equipment and control the hazardous energy. Employees were thereby exposed to the unexpected re-energization of equipment.