Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1157891.015
Citation: 01001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,235.00
Current Penalty: $3,500.00
Issuance Date: 11/15/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/30/2016
Gravity:
Report ID: 0627700
Contest Date:
Final Order: 12/05/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/05/2016 | $3,500.00 | 12/30/2016 | Other | |
| Penalty | Z: Issued | 11/15/2016 | $6,235.00 | 12/30/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.119(d)(3)(i)(B): Piping and instrument diagrams (P&ID's) were not updated; This violation was most recently observed on or about June 21, 2016 and times prior thereto and times thereafter, in the engine room when the employer failed to ensure the Process Safety Information (PSI) such as P&ID diagrams were updated and accurate. Discrepancies include, but are not limited to: 1. Filter drier and piping system not shown. 2. Piping connecting Valve 100 to adjacent piping not shown for Control Pressure Receiver vessel.