Standard Cited: 19100303 F02 General.
Inspection Nr: 1155090.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,138.00
Current Penalty: $1,390.00
Issuance Date: 10/19/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/15/2016
Gravity: 1
Report ID: 0418100
Contest Date:
Final Order: 11/14/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/14/2016 | $1,390.00 | 12/15/2016 | Serious | |
| Penalty | Z: Issued | 10/19/2016 | $2,138.00 | 11/15/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: On or about 6/15/2016 in the boiler room and throughout the electrical panels at 4300 Snapfinger Wood, Decatur, GA: Where employee(s) were removing and replacing wall mounted air conditioner units rated at 240 volts AC, the disconnect breakers in the electrical panels were not legibly marked to indicate their purpose. On or about 6/9/2016 an employee was fatally injured while performing this task without properly de-energizing the unit and not specific written energy control procedure provided by the employer.