Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1151724.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Not Completed - Solicitor Advised
Initial Penalty: $9,603.00
Current Penalty: $9,603.00
Issuance Date: 08/17/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 09/06/2016
Gravity: 10
Report ID: 0317300
Contest Date: 09/12/2016
Final Order: 01/26/2018
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/26/2018 | $9,603.00 | 09/06/2016 | Serious | |
Penalty | C: Contested | 09/14/2016 | $9,603.00 | 09/06/2016 | Serious | |
Penalty | Z: Issued | 08/17/2016 | $9,603.00 | 09/06/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.451(b)(1): Platform(s) on all working levels of scaffolds, were not fully planked or decked between the front uprights and guardrail supports such that the space between adjacent units, and the space between the platform and the uprights is no: a) 515 Briddle Drive, Wilmington, DE-On or about June 2, 2016, the employer failed to provide fully planked platforms at all working levels. Note: Pursuant to 29 CFR 1903.19, the employer must submit abatement certification and documentation, required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written documentation.