Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 113940100
Citation: 01001A
Citation Type: Serious
Abatement Date: 01/12/1995 X
Initial Penalty: $3,500.00
Current Penalty: $1,750.00
Issuance Date: 01/04/1995
Nr Instances: 3
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0216000
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/23/1995 | $1,750.00 | 01/12/1995 | Serious | |
Penalty | Z: Issued | 01/04/1995 | $3,500.00 | 01/12/1995 | Serious |