Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1138546.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 05/20/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 05/26/2016
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 06/16/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/16/2016 | $4,200.00 | 05/26/2016 | Serious | |
| Penalty | Z: Issued | 05/20/2016 | $7,000.00 | 05/26/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: (a) On or about April 7, 2016, in the attic, employees who were installing HVAC equipment and working in close proximity to electrical wiring were exposed to an electrical hazard.
Translate