Violation Detail
Standard Cited: 19100119 D03 I A Process safety management of highly hazardous chemicals.
Inspection Nr: 1130977.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 07/28/2016
Nr Instances: 3
Nr Exposed: 350
Abatement Date: 03/31/2017
Gravity: 10
Report ID: 0112600
Contest Date:
Final Order: 08/24/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/24/2016 | $3,500.00 | 03/31/2017 | Serious | |
Penalty | Z: Issued | 07/28/2016 | $7,000.00 | 12/12/2016 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.119(d)(3)(i)(A): The employer did not complete a compilation of process safety information (PSI) pertaining to the material of construction of equipment in the process. a) Outside the facility at 106 Lonczak Drive Chicopee, MA: On or about April 13, 2016, the employer did not compile PSI pertaining to the polyethylene (PE) piping between the outdoor, underground propane storage tank and the Northwest wall of the facility where the propane piping enters the facility. b) Inside the facility at 106 Lonczak Drive Chicopee, MA: On or about April 13, 2016, the employer did not compile PSI pertaining to the metallic piping supplying propane to the heat treat furnaces and endothermic gas generators in the heat treat department. c) Inside the facility at 106 Lonczak Drive Chicopee, MA: On or about April 13, 2016, the employer did not compile PSI pertaining to the flexible hose at the propane distribution points for the two banks of rotary furnaces in the heat treat department.