Violation Detail
Standard Cited: 19100119 D02 I A Process safety management of highly hazardous chemicals.
Inspection Nr: 1127242.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,950.00
Current Penalty: $3,465.00
Issuance Date: 06/23/2016
Nr Instances: 1
Nr Exposed: 22
Abatement Date:
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 07/13/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/13/2016 | $3,465.00 | Serious | ||
Penalty | Z: Issued | 06/23/2016 | $4,950.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.119(d)(2)(i)(A): The employer did not develop the block flow diagram or simplified process flow diagram (see Appendix B to this section) of the required process technology information: a) On March 3, 2016, the employer was not able to provide a copy of block flow diagram for the Sulfur Dioxide Delivery System for the CB-22-1, CB-22-2, L-20, Large Redford Gas Box and Small Gas Box core making machines.