Standard Cited: 19260416 A01 General requirements.
This violation item has been deleted.
Inspection Nr: 1088995.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,800.00
Current Penalty: $0.00
Issuance Date: 11/05/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0112000
Contest Date: 12/02/2015
Final Order: 04/04/2016
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 04/04/2016 | $0.00 | Serious | ||
| Penalty | C: Contested | 12/04/2015 | $2,800.00 | Serious | ||
| Penalty | Z: Issued | 11/05/2015 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: On or about 09/01/2015 employees at the Nomads renovation project were exposed to electrical hazards. An employee was working on an energized circuit without protection from electric shock.