Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1066677.015
Citation: 01001A
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $1,000.00
Issuance Date: 11/25/2015
Nr Instances: 1
Nr Exposed: 100
Abatement Date: 12/24/2015
Gravity:
Report ID: 0111400
Contest Date: 12/21/2015
Final Order: 10/20/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/20/2016 | $1,000.00 | 12/24/2015 | Other | |
Penalty | C: Contested | 12/22/2015 | $5,000.00 | 12/24/2015 | Serious | |
Penalty | Z: Issued | 11/25/2015 | $5,000.00 | 12/24/2015 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: Facility: An annual review of the company's LOTO program was not conducted and, as a result, LOTO program deficiencies were not identified.