Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 106110182
Citation: 01001A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $450.00
Current Penalty: $350.00
Issuance Date: 11/01/1991
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/05/1991
Gravity: 01
Report ID: 0418800
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/25/1991 | $350.00 | 11/05/1991 | Serious | |
Penalty | Z: Issued | 11/01/1991 | $450.00 | 11/05/1991 | Serious |