Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 105747679
Citation: 01001A
Citation Type: Serious
Abatement Status: X
Initial Penalty: $280.00
Current Penalty: $280.00
Issuance Date: 02/09/1990
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 02/15/1990
Gravity: 04
Report ID: 0355112
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate