Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1051184.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,000.00
Current Penalty: $3,750.00
Issuance Date: 09/30/2015
Nr Instances: 25
Nr Exposed: 80
Abatement Date: 05/31/2016
Gravity: 5
Report ID: 0524530
Contest Date: 10/27/2015
Final Order: 05/31/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/31/2016 | $3,750.00 | 05/31/2016 | Serious | |
Penalty | C: Contested | 11/02/2015 | $5,000.00 | 10/27/2015 | Serious | |
Penalty | Z: Issued | 09/30/2015 | $5,000.00 | 10/27/2015 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: The employer did not ensure that periodic inspections of the energy control procedures were conducted at least annually.