Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 1009147.015
Citation: 01001A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,600.00
Current Penalty: $1,500.00
Issuance Date: 04/28/2015
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 06/17/2015
Gravity: 5
Report ID: 0111400
Contest Date:
Final Order: 05/21/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/21/2015 | $1,500.00 | 06/17/2015 | Serious | |
| Penalty | Z: Issued | 04/28/2015 | $3,600.00 | 06/17/2015 | Serious |
Text For Citation: 01 Item/Group: 001A Hazard:
29 CFR 1910.36(d)(1): Employee(s) were not able to open an exit route door from the inside at all times without keys, tools, or special knowledge: Weld and Paint Shop: The door at the front of the last bay was locked by a sliding bolt requiring special knowledge to open exposing employees to being caught-in smoke or fire.
Translate