Violation Detail
Standard Cited: 19260651 C02 Specific Excavation Requirements.
Inspection Nr: 999244.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,000.00
Current Penalty: $3,000.00
Issuance Date: 10/17/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/13/2014
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 10/27/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 10/27/2014 | $3,000.00 | 11/13/2014 | Serious | |
| Penalty | Z: Issued | 10/17/2014 | $4,000.00 | 11/13/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.651(c)(2): A stairway, ladder, ramp or other safe means of egress was not located in trench excavations that were 4 feet (1.22m) or more in depth so as to require no more than 25 feet (7.62m) of lateral travel for employees: a.) Spalj Construction Company doing business as Fiber Technology, Inc., Brawley Walkway Summers Street Charleston: On or about 10/08/14, an employee was observed working in a trench excavation 4'10" in depth without the use of a safe means of egress. ABATEMENT CERTIFICATION REQUIRED
Translate