Standard Cited: 19260351 B04 Arc welding and cutting.
Inspection Nr: 998086.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,970.00
Current Penalty: $1,485.00
Issuance Date: 10/22/2014
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 1
Report ID: 0317500
Contest Date:
Final Order: 11/14/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/14/2014 | $1,485.00 | Serious | ||
| Penalty | Z: Issued | 10/22/2014 | $2,970.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.351(b)(4): Cables in need of repair were used or when a cable, other than the cable lead referred to in paragraph (b)(2) of this section, became worn to the extent of exposing bare conductors, the portion thus exposed was not protected by means of rubber and friction tape or other equivalent insulation: a) Job site, 235 Solar Drive, Imperial, PA: On or about October 2, 2014, during construction activities, the employer did not ensure that damaged sections of welding cables were made safe, including but not limited to, areas where bare conductors showed through the outer jacket.