Violation Detail
Standard Cited: 19100124 J02 I
Inspection Nr: 987114.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,525.00
Current Penalty: $1,767.50
Issuance Date: 10/27/2014
Nr Instances: 1
Nr Exposed: 15
Abatement Date:
Gravity: 1
Report ID: 0524500
Contest Date:
Final Order: 11/18/2014
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/18/2014 | $1,767.50 | Serious | ||
| Penalty | Z: Issued | 10/27/2014 | $2,525.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.124(j)(2)(i): The employer did not ensure airflow was adequate at least quarterly during operation: Employees were exposed to potential hydrogen gas buildup due to excessive foaming in the plating process and the employer had not ensured, at least quarterly, that during operation the air flow was adequate at chrome tank #26 in the plating department.