Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 975162.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,250.00
Current Penalty: $4,250.00
Issuance Date: 10/28/2014
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 11/17/2014
Gravity:
Report ID: 0317000
Contest Date:
Final Order: 11/13/2014
Related Event Code (REC): R
Emphasis:
Substance: 0170
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/13/2014 | $4,250.00 | 11/17/2014 | Other | |
| Penalty | Z: Issued | 10/28/2014 | $4,250.00 | 11/17/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. R-22 Engine Room, Skid Package #1, Oil Pot, Three-way Valve Manifold - The employer did not utilize written procedures that specify the equipment that should be shut down and isolated as well as the precautions to be followed before the removal of the pressure relief valves. Contractor employees were exposed to the unexpected release of ammonia while removing these valves. Observed on or about April 29, 2014.