Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 963837.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,800.00
Current Penalty: $1,400.00
Issuance Date: 04/01/2014
Nr Instances: 5
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0215000
Contest Date:
Final Order: 04/25/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/25/2014 | $1,400.00 | Serious | ||
| Penalty | Z: Issued | 04/01/2014 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports. Location: 457 39th Street Brooklyn, NY. On or about: 03/19/14 a) Employees were laying cinder blokcs from a tubular welded frame scaffold that was not fully planked. The employees were exposed to potential fall hazards of up to 13 feet to the ground below.
Translate