Violation Detail
Standard Cited: 19100119 J04 I Process safety management of highly hazardous chemicals.
Inspection Nr: 963743.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 09/03/2014
Nr Instances: 1
Nr Exposed: 33
Abatement Date: 11/01/2014
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 09/24/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/24/2014 | $7,000.00 | 11/01/2014 | Serious | |
Penalty | Z: Issued | 09/03/2014 | $7,000.00 | 09/22/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(j)(4)(i): Inspections and tests were not performed on process equipment: The employer did not ensure that all required inspections and tests were performed. A. The violation occurred in the Gas Processing/NRU Facility on or about March 18, 2014 and times prior thereto where the employer failed to ensure that all applicable inspections and tests were performed in accordance with the employer's mechanical integrity program. Identified process equipment pressure vessels: a. HBG-230 (Heat Exchanger) b. Tank 38 (Butane) c. Tank 40 (Slop Oil) d. Tank 32 (Propane) e. MBF-114 (Interstage Suction Scrubber)