Violation Detail
Standard Cited: 19260405 A02 II I Wiring methods, components, and equipment for general use.
Inspection Nr: 963596.015
Citation: 01001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $440.00
Current Penalty: $440.00
Issuance Date: 04/04/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity:
Report ID: 0134000
Contest Date:
Final Order: 04/14/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/14/2014 | $440.00 | Other | ||
| Penalty | Z: Issued | 04/04/2014 | $440.00 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.405(a)(2)(ii)(I): Flexible cords and cables used for temporary wiring were not protected from damage: (a) Location: 525 Main Street, Wakefield MA 01880 On or about 3/18/2014, the employer did not provide protection from damage to extension cords being used to power a pipe cutting lathe.
Translate