Violation Detail
Standard Cited: 19100036 D03 Design and construction requirements for exit routes.
Inspection Nr: 962911.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $3,300.00
Current Penalty: $1,815.00
Issuance Date: 08/29/2014
Nr Instances: 1
Nr Exposed: 20
Related Event Code (REC):
Gravity: 1
Report ID: 0524500
Contest Date: 09/22/2014
Final Order: 07/13/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/13/2016 | $1,815.00 | Serious | ||
Penalty | C: Contested | 09/24/2014 | $3,300.00 | Serious | ||
Penalty | Z: Issued | 08/29/2014 | $3,300.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(d)(3): Exit route doors were locked from the inside: Employees were exposed to the hazards of smoke inhalation and burns because the inside of the exit door located on the south wall of the Warehouse had a metal bar across it which acted like a lock, thus preventing easy egress.