Violation Detail
Standard Cited: 19260451 B03 General requirements.
Inspection Nr: 961406.015
Citation: 01001
Citation Type: Serious
Abatement Date: 10/31/2014 2
Initial Penalty: $2,800.00
Current Penalty: $500.00
Issuance Date: 07/03/2014
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0213900
Contest Date: 07/31/2014
Final Order: 12/01/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 12/01/2014 | $500.00 | 10/31/2014 | Serious | |
Penalty | C: Contested | 08/01/2014 | $2,800.00 | 07/12/2014 | Serious | |
Penalty | Z: Issued | 07/03/2014 | $2,800.00 | 07/12/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(3): The front edge of all platforms was not 14 inches (36 cm) or less from the face of the work, and no guardrail systems were erected along the front edge and/or no personal fall arrest systems were used in accordance with paragraph (g) of this section to protect employees from falling: a) 104 Emerson Court, southern most unit, end unit - Employees were working approximately 11-16 feet above the ground, from a pump jack scaffold platform approximately 24 inches from the front face of the building, on or about 03/05/14. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.