Violation Detail
Standard Cited: 19100253 B04 III Oxygen-fuel gas welding and cutting.
Inspection Nr: 959206.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,400.00
Current Penalty: $2,000.00
Issuance Date: 08/13/2014
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 08/19/2014
Gravity: 5
Report ID: 0336000
Contest Date:
Final Order: 08/29/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/29/2014 | $2,000.00 | 08/19/2014 | Serious | |
| Penalty | Z: Issued | 08/13/2014 | $3,400.00 | 08/19/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders or combustible materials (especially oil or grease), a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour. A.) Estes Express Lines, Inc., 64 Stefanak Drive, West Middlesex, PA 16159, fleet services parts area, on or about February 18, 2014 and time prior there to: Two oxygen cylinders were stored within five feet of four acetylene cylinder.
Translate