Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 955757.015
Citation: 01001
Citation Type: Other
Abatement Date: 04/10/2014 2
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 04/04/2014
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0215000
Contest Date:
Final Order: 04/29/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/29/2014 | $5,000.00 | 04/10/2014 | Other | |
Penalty | Z: Issued | 04/04/2014 | $5,000.00 | 04/10/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3): The employer did not ensure that exit routes are free and unobstructed with no materials or equipment placed, either permanently or temporarily, within the exit route: a) The exit pathway from the store checkout area to exit D is blocked by the shopping carts and a 4 ft high wall that was built across the passageway. b) Exit E was partly blocked by boxes stored on the steps leading to the exit; Exit located in the kitchen showroom mezzanine. Location: Home Depot Store located at 980 Third Ave, New York, N.Y. On or about 1/17/2014 NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM IN ACCORDANCE WITH 29 CFR 1903.19.