Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 948482.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 03/05/2014
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 03/11/2014
Gravity: 5
Report ID: 0214700
Contest Date:
Final Order: 03/31/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/05/2014 | $2,000.00 | 03/11/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports: a) Worksite, 1129 Long Beach Rd. South Hempstead NY - Employees were installing styrofoam to a two story commercial building while working from a fabricated frame scaffold that was not fully planked. The scaffold had two planks installed at the working level, approximately 12ft above the ground; on or about 11/14/13. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.