Violation Detail
Standard Cited: 19100176 B Handling materials - general.
Inspection Nr: 943092.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/25/2014 2
Initial Penalty: $7,000.00
Current Penalty: $4,000.00
Issuance Date: 04/01/2014
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): A
Gravity: 10
Report ID: 0316100
Contest Date:
Final Order: 04/22/2014
Emphasis:
Substance: 0628
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/22/2014 | $4,000.00 | 04/25/2014 | Serious | |
Penalty | Z: Issued | 04/01/2014 | $7,000.00 | 04/25/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.176(b): Storage of material created a hazard: b) Mechanical Room G028: The mechanical room did not have a Freon detection system with an audible alarm to alert employees in the event of a release of Freon R414B. Abatement certification and documentation required within 10 days after abatement date. The certification shall include a statement that abatement is complete, the date and method of abatement, and state that employees and their representatives were informed of this abatement. Abatement documentation shall include documents demonstrating that abatement is complete, such as evidence of the purchase or repair of equipment, photographic or video evidence of abatement or other written records.