Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 943019.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,250.00
Current Penalty: $3,000.00
Issuance Date: 12/09/2013
Nr Instances: 2
Nr Exposed: 6
Abatement Date: 04/10/2014
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 01/03/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/03/2014 | $3,000.00 | 04/10/2014 | Serious | |
Penalty | Z: Issued | 12/09/2013 | $4,250.00 | 01/15/2014 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(1): One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a) Ingoing nip point was not guarded on #3 paper machine reel drum and partially built parent reel on August 7, 2013. b) On or about 12/3/2013, ingoing nip points on threading ropes for reel were not guarded. c) On or about 12/3/2013, ingoing nip point formed by idler roll and belts on back side of reel at startup tire was not guarded. ABATEMENT CERTIFICATION REQUIRED