Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 922118.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,960.00
Current Penalty: $3,000.00
Issuance Date: 08/27/2013
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 09/03/2013
Gravity: 5
Report ID: 0524500
Contest Date:
Final Order: 09/25/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/25/2013 | $3,000.00 | 09/03/2013 | Serious | |
| Penalty | Z: Issued | 08/27/2013 | $3,960.00 | 09/03/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2): The floor of every workroom shall be maintained in a clean and, so far as possible, a dry condition. Where wet processes are used, drainage shall be maintained, and false floors, platforms, mats, or other dry standing places should be provided where practicable. Engineered Plastic Components, Inc. had employees exposed to fall hazards from the accumulation of oil around equipment throughout the facility.
Translate