Violation Detail
Standard Cited: 19260451 C03 General requirements.
Inspection Nr: 914702.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 07/23/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0214500
Contest Date:
Final Order: 10/09/2013
Related Event Code (REC): I
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 07/23/2013 | $2,000.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(3): Supported scaffold poles, legs, posts, frames, and uprights shall be plumb and braced to prevent swaying and displacement. A) Side of house, bottom of scaffold Employees were exposed to fall hazards of approximately 13 feet while working on a pump jack scaffold that was not protected by a complete guard rail system or other means of fall protection in place, on or about May 17th 2013.