Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 911204.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $6,000.00
Issuance Date: 12/04/2013
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 12/29/2013
Gravity: 10
Report ID: 0213400
Contest Date: 12/23/2013
Final Order: 06/13/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 06/13/2014 | $6,000.00 | 12/29/2013 | Serious | |
| Penalty | C: Contested | 12/23/2013 | $7,000.00 | 12/29/2013 | Serious | |
| Penalty | Z: Issued | 12/04/2013 | $7,000.00 | 12/29/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
OSH ACT of 1970 Section (5)(a)(1): Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to an uncontrolled release of water and struck-by hazards from projectile equipment (i.e. valves). a) NJ American Water Watchung, NJ site - Corner of Brookdale Road and Mountain Boulevard: Employees were exposed to the hazards of an uncontrolled release of high pressure water and/or being struck-by a projectile valve as a result of the valve being inadequately restrained and secured to the Tee-junction. Condition noted on or about 06/18/2013. References: American National Standards Institute/ American Water Works Association AWWA M17 - Installation, Field Testing, and Maintenance of Fire Hydrants (Fourth Edition) Section: M17 4 - Installation pg. 22 #8 AWWA C600-10 - Installation of Ductile-Iron Mains and Their Appurtenances Section: 4.3.7 Installing Hydrants p.18 4.3.7.2.2
Translate