Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 909778.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $2,000.00
Current Penalty: $1,000.00
Issuance Date: 08/01/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): I
Gravity: 5
Report ID: 0214500
Contest Date:
Final Order: 09/26/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/26/2013 | $1,000.00 | Serious | ||
Penalty | Z: Issued | 08/01/2013 | $2,000.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: Location: On tubular welded scaffold. a) Employees were working on a tubular welded scaffold that was not fully planked; on or about 05/21/13.