Violation Detail
Standard Cited: 19261437 N05
Inspection Nr: 908871.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $4,410.00
Issuance Date: 07/03/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/16/2013
Gravity:
Report ID: 0215000
Contest Date:
Final Order: 08/14/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/14/2013 | $4,410.00 | 07/16/2013 | Other | |
| Penalty | Z: Issued | 07/03/2013 | $4,900.00 | 07/16/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.1437(n)(5): Physical attachment, corralling, rails system and centerline cable system meet the requirements in Option (1), Option (2), Option (3), or Option (4) of this section, and that whichever option is used also meets the requirements of paragraph (n)(5)(v) of this sect Site: 499 East 34th Street New York, NY On or about 5/29/13 a) The employer failed to secure the crane to prevent it from falling or tipping off a floating barge.