Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 906939.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $3,400.00
Current Penalty: $3,400.00
Issuance Date: 09/26/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/08/2013
Gravity:
Report ID: 0418300
Contest Date: 10/24/2013
Final Order: 03/26/2014
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 03/26/2014 | $3,400.00 | 10/08/2013 | Other | |
| Penalty | C: Contested | 10/25/2013 | $3,400.00 | 10/08/2013 | Serious | |
| Penalty | Z: Issued | 09/26/2013 | $3,400.00 | 10/08/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about April 29, 2013 - Procedures werenot developed, documented and utilized for controlling strip movement on Pickle Line #4 when employees were visually inspecting the strip at the exit end of the line from outside its path of travel.