Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 903117.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/07/2013 5
Initial Penalty: $2,520.00
Current Penalty: $2,520.00
Issuance Date: 05/28/2013
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): I;R
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 06/24/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 05/28/2013 | $2,520.00 | 06/07/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6): The clearance between scaffolds and power lines were less than 10 feet: a) 1509 Frankford Avenue - Employees were applying stucco from a tubular welded frame scaffold approximately 2 1/2 feet from a high power line of approximately 7.6kv to ground, exposing employees to an electrocution hazard. Observed on or about April 23, 2013.