Violation Detail
Standard Cited: 19260403 B02 General requirements.
Inspection Nr: 891982.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/29/2013 2
Initial Penalty: $2,100.00
Current Penalty: $2,100.00
Issuance Date: 03/12/2013
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 1
Report ID: 0317000
Contest Date:
Final Order: 04/09/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/12/2013 | $2,100.00 | 03/29/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.403(b)(2): Listed, labeled, or certified equipment was not installed and used in accordance with instructions included in the listing, labeling, or certification: (a) 1800 Warnock Street, Electrical service panel - On or about 2/23/2013, employees who were performing electrical work were exposed to electrical shock from Romex electrical cable listed for use in normally dry areas which was used in an outdoor and wet location for branch circuit wiring from the service panel to the site. \ Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.