Standard Cited: 19150181 B Electrical circuits and distribution boards.
Inspection Nr: 891507.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $3,500.00
Issuance Date: 05/10/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/18/2013
Gravity: 10
Report ID: 0418800
Contest Date:
Final Order: 06/07/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/07/2013 | $3,500.00 | 07/18/2013 | Serious | |
| Penalty | Z: Issued | 05/10/2013 | $7,000.00 | 06/06/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1915.181(b): Before an employee was permitted to work on an electrical circuit, except when the circuit must remain energized for testing and adjusting, the circuit was not de-energized and checked at the point at which the work was done to ensure that it was actually de-energized: a. On or about February 21, 2013, at the above addressed jobsite, an electrical circuit was not de-energized prior to an employee replacing a battery charger in a recreational boat, exposing a worker to a shock hazard.