Violation Detail
Standard Cited: 19100110 D10 Storage and handling of liquefied petroleum gases.
Inspection Nr: 891351.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,380.00
Current Penalty: $1,428.00
Issuance Date: 05/03/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date:
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 06/04/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/04/2013 | $1,428.00 | Serious | ||
| Penalty | Z: Issued | 05/03/2013 | $2,380.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.110(d)(10): Precautions were not taken to prevent damage to LP gas system(s) from vehicular traffic: (a) On or about February 20, 2013 - Outside of Building #5, a propane gas tank used to heat the building was not protected against impact with moving trucks in the area.
Translate