Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 77380.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,200.00
Current Penalty: $3,000.00
Issuance Date: 09/02/2011
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0524500
Contest Date:
Final Order: 09/20/2011
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/20/2011 | $3,000.00 | Serious | ||
Penalty | Z: Issued | 09/02/2011 | $4,200.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): \r\n\r\nEmployees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means:\r\n\r\nEmployees operating an aerial lift were exposed to electrical hazards. The employees working in proximity to energized electric power lines were not protected.\r\n