Violation Detail
Standard Cited: 19260451 A06 General requirements.
Inspection Nr: 768903.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,880.00
Issuance Date: 06/04/2013
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/28/2013
Gravity: 10
Report ID: 0317900
Contest Date:
Final Order: 06/17/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/17/2013 | $1,880.00 | 06/28/2013 | Serious | |
| Penalty | Z: Issued | 06/04/2013 | $2,800.00 | 06/28/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(a)(6): Scaffolds were not constructed in accordance with the design by a qualified person: a) Water Tower, Suspended Scaffold -- On or about December 5, 2012, two employees were working from a New England Boom supported scaffold, when the single wire rope supporting the scaffold failed. This scaffold was not constructed in accordance with the design developed by the Chicago Bridge & Iron Company and their related rigging guide.
Translate