Violation Detail
Standard Cited: 19260252 A Disposal of waste materials.
Inspection Nr: 762305.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 12/18/2012
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/24/2012
Gravity: 5
Report ID: 0112600
Contest Date:
Final Order: 01/15/2013
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/18/2012 | $2,000.00 | 12/24/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.252(a):Whenever materials are dropped more than 20 feet to any point lying outside the exterior walls of the building, an enclosed chute of wood, or equivalent material, was not used: (a) 68 North Pleasant St Amherst, MA: On or about November 20, 2012, employees were observed throwing/pushing roofing materials they had stripped from the roof of this building into a dumpster 25 feet below the roof eave.