Violation Detail
Standard Cited: 19260850 B Preparatory operations.
Inspection Nr: 722701.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $6,930.00
Current Penalty: $6,930.00
Issuance Date: 03/25/2013
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 04/04/2013
Gravity: 10
Report ID: 0936300
Contest Date:
Final Order: 04/18/2013
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 03/25/2013 | $6,930.00 | 04/04/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.850(b): The walls or floors were not shored or braced where employee(s) were required to work within a damaged structure to be demolished: Schofield Barracks Building 450: On October 29, 2012, employees were engaged in demolishing an interior concrete wall. They were demolishing the last of four quadrants when the wall collapsed, crushing an employee causing fatal injuries. The structural integrity of the wall was compromised by the damage caused by the removal of the first three quadrants. The employer failed to shore or brace the remaining wall quadrant.