Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 709899.015
Citation: 01001
Citation Type: Other
Abatement Date: 02/01/2013 2
Initial Penalty: $5,000.00
Current Penalty: $0.00
Issuance Date: 01/28/2013
Nr Instances: 5
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0111700
Contest Date:
Final Order: 02/21/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 02/22/2013 | $5,000.00 | 02/01/2013 | Serious | |
Penalty | F: Formal Settlement | 02/21/2013 | $0.00 | 02/01/2013 | Other | |
Penalty | F: Formal Settlement | 02/21/2013 | $5,000.00 | 02/01/2013 | Other | |
Penalty | Z: Issued | 01/28/2013 | $5,000.00 | 02/01/2013 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. Site - The employer did not develop, implement and utilize a lockout procedure for the Press Master #5(Model CFP-12T S/N 0800420-90) power press. b. Site - The employer did not develop, implement and utilize a lockout procedure for the Press Master (Model CFP-12T S/N 0800420-04) power press. c. Site -The employer did not develop, implement and utilize a lockout procedure for the Greennerd Press (Model HPB-10 S/N 99T5746) power press. d. Site - The employer did not develop, implement and utilize a lockout procedure for the Power Press (number D6). e. Site - The employer did not develop, implement and utilize a lockout procedure for the Power Press (number D8).