Violation Detail
Standard Cited: 19260850 A Preparatory operations.
Inspection Nr: 589438.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,900.00
Current Penalty: $2,940.00
Issuance Date: 11/14/2012
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/23/2012
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 12/04/2012
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/04/2012 | $2,940.00 | 11/23/2012 | Serious | |
Penalty | Z: Issued | 11/14/2012 | $4,900.00 | 11/23/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.850(a): An engineering survey was not performed by a competent person to determine the conditions of the framing floors and walls and the possibility of unplanned collapse of any portion of the structure prior to permitting employees to start demolition operations: The employer does not consult with and maintain documentation from a Professional Engineer before performing dismantling operations. This violation occurred on or about August 14, 2012, outside at the back of the building, where an employee was to disconnect an open-face awning structure from an exisiting building to relocate the structure to another area. A Professional Engineer was not consulted to ensure how the work tasks could be performed safely. Employee torch cut the I-beam that connected the structure and building and the structure collapsed. Pursuant to 29 CFR 1903.19, within ten (10) calendar days of the abatement date, the employer must submit documentation showing that it is in compliance with the standard, including written evidence describing the steps that it is taking to ensure prior to dimantling operations, the worksite where activity is to take place, will be evaluated by a Professional Engineer to ensure employee safety.