Violation Detail
Standard Cited: 19100036 D02 Design and construction requirements for exit routes.
Inspection Nr: 317017077
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,000.00
Current Penalty: $2,000.00
Issuance Date: 06/07/2013
Nr Instances: 1
Nr Exposed: 34
Abatement Date: 07/03/2013
Gravity: 02
Report ID: 0257260
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate