Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 316970151
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,800.00
Current Penalty: $2,800.00
Issuance Date: 04/14/2014
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/05/2014
Gravity:
Report ID: 1055340
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate