Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
This violation item has been deleted.
Inspection Nr: 316068535
Citation: 01001
Citation Type: Serious
Abatement Date: 03/19/2012 I
Initial Penalty: $4,200.00
Current Penalty:
Issuance Date: 03/14/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0134000
Contest Date: 04/10/2012
Final Order: 02/15/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/15/2013 | 03/19/2012 | Serious | ||
Penalty | Z: Issued | 03/14/2012 | $4,200.00 | 03/19/2012 | Serious |