Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 315751198
Citation: 01001
Citation Type: Serious
Abatement Date: 01/20/2012 I
Initial Penalty: $2,040.00
Current Penalty: $2,040.00
Issuance Date: 01/17/2012
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 05
Report ID: 0213100
Contest Date:
Final Order:
Emphasis: